Phase 2 Service during the construction process

      1.  coordination between designers Contractors and project owners to monitor
          Land boundaries and building construction site planning  ready to deliver the area
          construction for the contractor to comply with the conditions of the construction contract
     2.   Prepare the main project plan in accordance with the project goals.
     3.  Facilitate, coordinate and inspect the construction site preparation
          Temporary roads, temporary sheds for all contractors within the construction site.
     4.   Prepare a payment plan (Cash Flow) of the project and propose to the project owner.
     5.   document system Document form within the project
     6.   completeness check and the conformity of the pattern and details
          Assemble the model
     7.   Review and approve the contractor's detailed construction plan.
          in accordance with the main plan
     8.   Consider, review and approve manpower plans, equipment, tools and machines
     9.   Determine the period of preparation of sub-plans, work schedules of contractors
   10.   Consider, review and approve sub-plans, contractor's work schedule
   11.   Control and manage the project to be in accordance with the main work plan, manpower plan, equipment
          tools and machines and sub-plans of the project
   12.   Monitor the progress of construction Identify delays and find a solution.
          expedite the implementation of the main work plan, manpower plan, equipment, tools and machinery
          and sub-plans of the project
   13.   Prepare monthly progress report of the construction work.
          or every term that is deemed necessary
   14.   Determine the work plan for the preparation, consideration and examination of the construction drawings.
          (Shop Drawing) of the contractor
   15.   Consider, inspect and approve the shop drawing
   16.   Control and inspect the construction to be in accordance with form for construction
          (Shop Drawing)
   17.   Supervise the presentation of construction procedures and methods from the contractor.
   18.   Recommend, suggest, improve or change the construction method to be carried out
          go fast
   19.   Consider, inspect and approve construction procedures to be in accordance with
          requirements, working standards and according to academic principles and in accordance with
          Form, form, details, and contract
   20.   Control and inspect the construction to be in accordance with construction algorithm
          according to working standards and academic principles and in accordance with
          Forms, details, accompanying forms and contracts
   21.   Determine a delivery plan request material approval and use of materials of the contractor
   22.   Consider, review and approve delivery, request material approval and use of materials
          according to the form, the details of the assembly and the contract
   23.   control, inspect and test various materials To have quality according to the form and details
          Assembly and contract
   24.   Set up a field test plan.
   25.   Participate in field testing according to the form, details, drawings and contracts
   26.   Consulting and participating in safety planning within the project
   27.   Consider, review and approve the safety plan within the project.
          to meet the requirements work standards and according to academic principles
   28.   Control and inspect the construction to be in accordance with safety plan
   29.   Check the quality of work according to the form Assembly details
          and contracts and meet the requirements work standards and according to academic principles
   30.   Reject work or material that does not conform to the format. Assembly details
          and contracts or does not meet the requirements work standards and according to academic principles
   31.   Order to stop work when it sees that there will be damage to the project or when it sees that
          not safe
   32.   Coordinate with project owners, designers, contractors, etc. to fix.
          problems
   33.   Coordinate with the contractor in preparing the list and the material delivery plan.
         purchased by owner into the construction department for the contractor to install
   34.   Supervise, control and inspect the main contractor Construction coordination
          with all contractors within the construction unit according to the details
          Assembly and contract
   35.   Consultation on construction quality for the project
   36.   Consultation on construction budget for the project
   37.   Consultation on construction methods and techniques for the project
   38.   Consulting on construction safety for the project
   39.   schedule a general meeting monthly project to summarize progress
          Problems and obstacles in construction work each month
   40.   Schedule an internal meeting once a week. to summarize progress
          Problems and obstacles in construction work each week
   41.   Schedule a special meeting to follow up on work and fix urgent problems
   42.   Prepare documents, meeting agendas and meeting minutes
   43.   Verify the correctness and certify in the request for disbursement of the construction cost
          of the contractor
   44.   Review and appraise the price of the project's change, increase-decrease.
   45.   Check the quantity and price of the work to change the increase-decrease. from the contractor
   46.   Prepare a document that summarizes the price of the project's changes, increase-decrease.
   47.   Consulting and working with the project owner in negotiating the price of the work
          change increase-decrease
   48.   Conducting Test & Commissioning audits of various systems
          to be in accordance with the form and details accompanying the drawing
   49.   Provide full training for project personnel who will take care of
          and building maintenance
   50.   Check and make a list of tasks that need to be fixed (Defect List).
   51.   Follow up and check the correction of the work according to the list to be corrected (Defect List).
          complete